Cruise terminals combine technical, operational, and infrastructural requirements in a confined space. In addition to the reliable provision of shore power, safety, the passenger experience, terminal operations and international standards must all be taken into account. Find out which challenges shape modern shore power projects and how flexible solutions enable a safe and future-proof ship connection.
The requirements of IEC 80005-1 and the safe connection between ship and shore power - the so-called connection dilemma - are among the key challenges of shore power projects.
The IEC 80005-1 standard series defines the requirements for high-voltage shore connection (HVSC) systems and forms the basis for a safe and globally interoperable shore power infrastructure. For cruise ships, the standard defines the technical interfaces between ship and terminal and ensures that shore power systems can be planned, tested, and operated in a uniform manner worldwide. This ensures compatibility and operational safety.
The standard defines the safe energy transfer between ship and terminal. However, handling several heavy high-voltage cables in publicly accessible and passenger-intensive terminal areas remains one of the central challenges of modern shore power projects in cruise terminals.
Shore power supply in ports has become increasingly important in recent years, especially in Europe. The EU has clear climate targets and is calling for a significant reduction in CO₂ emissions from shipping so as to become climate-neutral by 2050.
As a result, EU ports that reach a specified traffic volume are obliged to provide shore power for ships starting in 2030.
Read our case study to find out which challenges had to be solved during implementation and how the solution and result contribute to sustainability.

In the video: Installation of the mobile shore power connection "iMSPO" at the port of Rotterdam.
To reduce exhaust emissions and noise in urban areas and to comply with the environmental regulations that will apply from 2030, the Port of Rotterdam is relying on an innovative shore power system from igus: the iMSPO Cruise in the trench. When the system is not in use, the terminal is fully available to the public. No permanently installed sockets or similar disturb the ambience. The movable "socket" provides a flexible and efficient mounting point for cruise ships along the 230-metre-long connection area, regardless of the ship's berthing position (see connection dilemma). The system is installed underground in a trench made of precast concrete parts and moves precisely to the desired connection position with the help of an igus E4 heavy-duty rol e-chain. The connection process is particularly fast, safe and ergonomic. The supply is provided with up to 16 MW of power from renewable energy sources.
The result: Less CO₂, less noise, more quality of life - a pioneering step for sustainable port infrastructure.
Find out more about the various configurations, integration options, and technical versions of the iMSPO.
HYBEKO SP S60 DC | Transfer machine for cruise ship shore power connections
For years, ports and terminals around the world have relied on igus shore power supply solutions. From container and cruise terminals to applications at RoRo terminals - our systems prove themselves daily under real operating conditions on all continents.

In person:
Monday to Friday from 7 am - 17 pm.
Saturdays from 8 am- 12 pm.
Online:
24h
WhatsApp-Service:
Montag – Freitag: 8 – 16 Uhr